Bu öğeden alıntı yapmak, öğeye bağlanmak için bu tanımlayıcıyı kullanınız: http://hdl.handle.net/11513/347
Tüm üstveri kaydı
Dublin Core AlanıDeğerDil
dc.contributor.authorPolat, Refik-
dc.contributor.authorAk, Bekir Erol-
dc.contributor.authorAçar, İzzet-
dc.date.accessioned2019-06-20T06:52:24Z-
dc.date.available2019-06-20T06:52:24Z-
dc.date.issued2007-
dc.identifier.otherDOI: 10.3923/jas.2007.151.154-
dc.identifier.urihttp://hdl.handle.net/11513/347-
dc.description.abstractThis study was performed with the objective to investigate the work process, work capacity, work effectiveness, energy consumption and labor force requirements of basic units such as washing, dehulling, sorting, separating, roasting and packing in a pistachio processing plant which has been mechanized in the last years. As a result of this study, the work capacity in washing, sorting, breaking, drying, separating units was found to be 1.5, 1.5, 2, 1, 1.6 t h<SUP>-1</SUP>, respectively. The work effectiveness in sorting and breaking units was found to be 95% and that of separating unit was 99%. The total energy consumption of the units was found to be 20.42 kW h<SUP>-1</SUP> and the total labor force requirement was found to be five workers.en_US
dc.language.isoenen_US
dc.publisherJournal of Applied Sciencesen_US
dc.titleSome Working Parameters and Energy Use in a Pistachio Nut Processing Plant: A Case Studyen_US
dc.typeArticleen_US
Koleksiyonlarda Görünür:Bahçe Bitkileri Bölümü

Bu öğenin dosyaları:
Dosya Açıklama BoyutBiçim 
A-2.pdf2.43 MBAdobe PDFGöster/Aç


DSpace'deki bütün öğeler, aksi belirtilmedikçe, tüm hakları saklı tutulmak şartıyla telif hakkı ile korunmaktadır.